
POLICE SECURITY
Police Security Dover 1000 Lumen Rechargeable Flashlight USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant w/Belt Clip.
CHF77.68
CHF129.47
-
Order within to get between
-
Tracked Shipping on All Orders
-
14-Day Returns
- Secure Payments
-
24/7 Customer Support
Description
- Ultra-Bright Performance: Delivers a powerful 1000 lumens with a beam distance of up to 210 metersideal for mechanics, automotive work, and emergency situations.
- Long-Lasting & Rechargeable: Equipped with a high-capacity 18650 2600mAh lithium-ion battery for up to 6 hours of runtime on Low mode. Rechargeable via included USB-C cable.
- Versatile Lighting Modes: Features 3 adaptable settingsHigh (1000 lm), Low (250 lm), and Flashfor various lighting needs, plus Slide Focus for adjustable beam control.
- Durable & Portable: Impact resistant with a compact 6.65" body and integrated belt clip for easy everyday carry. Built to handle tough work environments.
- No stand alone batteries are sold with this product
Police Securitys Dover rechargeable, 800 lumen LED flashlight, is optimal for automotive technicians and other professionals who demand long-term flashlight performance. With our Quik Connect USB charging system (cable included), this light functions with a 18650 rechargeable lithium-ion battery delivering up to 11 hours runtime. With high, low, flash modes and slide focus, this flashlight is immediately adaptable to a variety of situations.
Shipping and Returns
- We offer tracked shipping on all orders. Tracking information will be shared as soon as the order is dispatched.
- Please check the delivery estimate before adding a product to the cart. This is displayed for every product on the website.
- Available shipping methods and charges will be displayed at the time of checkout, depending on your exact location.
- All customers are entitled to a return window of 14 days, starting from the date of delivery of the product(s).
- Customers are advised to read our return policy for details of the return process, eligibility, refunds as well as cancellations or exchanges.
- In case of any issues or concerns about Shipping or Returns, please contact us and we will be happy to help.
Police Security.
Police Security Dover 1000 Lumen Rechargeable Flashlight ...
CHF77.68
CHF129.47